Status
- constructed
Cost
- £15.9m
Overview
The scheme consisted of construction of a 7.3m wide single carriageway, 1.1km in length including 4 new roundabouts. It leads from the existing A32 Cherrymount roundabout on the north of the town to link with the existing B80 Tempo Road on the south-east of the town.
Key dates
- work commenced 10 October 2011
- officially opened 5 June 2013