This Stage 3 Scheme Assessments Report (SAR3), provides a summary of the stage 3 assessments for the A29 Cookstown Bypass project and makes recommendations on the Preferred Route to be taken forward to the next stage.
The primary focus of this report is to describe the engineering aspects of the Proposed scheme that inform the Draft Orders and EIAR.
Documents
- A29 Cookstown Bypass - Stage 3 Scheme Assessment Report
- Appendix A, Scheme Overview Plan
- Appendix A, Highway Plans and Profiles, Mainline Plan, Loughry Roundabout to Old Coagh Road
- Appendix A, Highway Plans and Profiles, Mainline Plan, Old Coagh Road to Moneymore Road incl Castle Link road
- Appendix A, Highway Plans and Profiles, Moneymore Rd and Sandholes Link Road
- Appendix A, Highways Plans and Profiles, Clare Lane Road, Coagh Road and Old Coagh Road
- Appendix A, Mainline and Sandholes Link Road
- Appendix A, Pavement Design
- Appendix A, Drainage Plan
- Appendix A, Structures Location Key Plan
- Appendix A, Bridge Structures Typical Layouts
- Appendix A, Retaining Structures Typical Layouts
- Appendix A, Concrete Box Portal Typical Layouts
- Appendix A, Geological Plans and Profiles
- Appendix B, Traffic Model Verification
- Appendix C, Appraisal Summary Table
- Appendix D, Departures and Relaxations
- Appendix E, Demand Sensitivity Appraisal