Traffic Calming Scheme - Connswater Street, Belfast

Topics:
Consultation opened on 29 November 2017. Closing date 02 January 2018.

Summary

Notice is hereby given that under ‘Article 65’ of the ‘Roads (Northern Ireland) Order 1993’ the Department for Infrastructure (DfI) proposes to provide traffic calming measures on Connswater Street to control the speed of traffic.

Documents

Consultation description

The works will consist of:

Connswater Street

  • One flat top taper sided road humps, 4.9m long, 5.0m wide and 80mm high
  • One flat top taper sided road hump, 5.0m long, 6.95m wide and 50mm high

All road humps will be constructed in accordance with The ‘Road Humps Regulations (Northern Ireland) 1999’. All road markings and signage will be in accordance with the ‘Traffic Signs Regulations (Northern Ireland) 1997’. 

Inspecting the proposal

A large plan of the proposals may be inspected online, free of charge, until 2 January 2018 by visiting the following offices (during opening hours):

DfI Roads
Belfast South Section Office
1a Airport Road
Belfast
BT3 9DY
DfI Roads
Eastern Division HQ
Hydebank
4 Hospital Road
Belfast
BT8 8JL

Making an objection

Objections to these proposals may be made in writing to the Department for Infrastructure, Roads, via e-mail to traffic.eastern@infrastructure-ni.gov.uk  or via letter before 2 January 2018 to the following address:

DfI Roads, Eastern Division
Hydebank
4 Hospital Road
Belfast
BT8 8JL

Share this consultation

Back to top