Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Closed consultation The Proposed Traffic Calming Scheme, B45 Eglish Road Eglish

    Topics:
    • Roads legislation, 
    • Road users

    Consultation closed Consultation opened 24 September 2025, 9.00 am and closed 27 October 2025, 5.00 pm

    Summary

    PROPOSED TRAFFIC CALMING
    B45 Eglish Road, Eglish, Dungannon

    Notice is hereby given that under Article 65 of the Roads (NI) Order 1993, the Department for Infrastructure proposes to introduce road humps and other traffic calming works at Eglish Road, to control the speed of traffic.

    Documents

    • The Proposed Traffic Calming Scheme, B45 Eglish Road Eglish - Order Adobe PDF (117 KB)
    • The Proposed Traffic Calming Scheme, B45 Eglish Road Eglish - Map Adobe PDF (627 KB)

    Help viewing documents

    Consultation description

    The road humps will be constructed in accordance with the Road Humps Regulations (NI) 1999, other features will be constructed in accordance with the Traffic Calming Regulations (Northern Ireland) 1995, and consist of:

    1 no set of triple speed cushions, approximately 3.1 metres long, 1.9 metres wide and 75mm high, at the following location:

    • Adjacent to St Patrick’s Cemetery

    1 no set of double speed cushions, approximately 3.1 metres long, 1.9 metres wide and 75mm high, at the following location:

    • Adjacent to No 111 Eglish Road

    Making an objection                                                                                               Objections or other representations may be made to the Department for Infrastructure, Roads, Network Development, County Hall, Drumragh Avenue, Omagh, BT79 7AF,  within the stated period. 

    Inspecting the proposal                                                                                                     A map showing the road humps and other traffic calming works may be inspected free of charge, during office hours at the above-mentioned office, by appointment only.  Email TrafficDungannon@infrastructure-ni.gov.uk to arrange.

    D Healy

    Western Divisional Roads Manager

    Authorised Officer

    11 September 2025

    Ways to respond

    Consultation closed — responses are no longer being accepted.

    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens