Proposed Extension to Traffic Calming Scheme at Clabby Road, Clabby

Consultation opened on 09 February 2022. Closing date 13 March 2022.

Summary

Notice is hereby given that under Article 65 of the Roads (NI) Order 1993, that the Department proposes to introduce additional road humps to the existing traffic calming measures on Clabby Road, Clabby.

Documents

Consultation description

The road humps will be constructed in accordance with the Road Humps Regulations (NI) 1999, other features will be constructed in accordance with the Traffic Calming Regulations (Northern Ireland) 1995.

The scheme will consist of one pair of speed cushions approximately 3.1 metres long 1.9 metres wide and 75mm high adjacent to street light number 61.

Inspecting the proposal

A map showing the road humps and other traffic calming works may be inspected free of charge, please contact TrafficFermanagh@infrastructure-ni.gov.uk to arrange a viewing.

Making an objection

Objections or other representations may be made to the  may be made in writing to the Department at the address below before 13 March 2022.

Department for Infrastructure,
Roads, Network Development,
Castle Barracks,
Wellington Road,
Enniskillen,
BT74 7HN 

 

Share this consultation

Back to top