DfI TRAM Future Tenders
Details of future DfI Transport and Road Asset Management (DfI TRAM) opportunities are listed below including details of the proposed works, estimated value and estimated date of release.
Further information
Further information on future opportunities can be found at the Investment Strategy for Northern Ireland website.
| Title | Servicing, Maintenance and Repair of Agri & Large Horticultural Plant Items |
|---|---|
| Estimated value (ex VAT) | £1.1m |
| Estimated release date | November 2026 |
| Detail | DfI wishes to establish one or more contracts for the provision of servicing, maintenance and repair of its horticultural plant items. |
| Title | Provision of NHSS12D - TTMBC, T1, T1/T2, T4, T6, T7 Training and Assessment |
|---|---|
| Estimated value (ex VAT) | £350k |
| Estimated release date | November 2026 |
| Detail | DfI wishes to establish a Framework Agreement for the provision of NHSS12D - TTMBC, T1, T1/T2, T4, T6, T7 training and assessment. |
| Title | DfI TRAM – Provision of Certificate of Professional Competence (CPC) Training (4 Lots) |
|---|---|
| Estimated value (ex VAT) | £324k |
| Estimated release date | November 2026 |
| Detail | DfI Training Centre wishes to establish a Framework Agreement with up to two Training Providers, for each Lot, to provide CPC training across Northern Ireland which is to be delivered to the standards of the Joint Approvals Unit for Periodic Training (JAUPT) |
| Title | Major Civil Engineering Works Framework |
|---|---|
| Estimated value (ex VAT) | TBC |
| Estimated release date | November 2026 |
| Detail | The Contracting Authority intends to establish a multi-lot framework for the delivery of road and civil engineering works with an estimated individual contract value exceeding £5 million (excluding VAT), including:
Multiple suppliers are expected to be appointed to each lot. The anticipated works value ranges covered by each lot, excluding VAT, are:
|
| Title | Provision of Marine Electrical Maintenance Services for the Strangford Lough Ferry Service |
|---|---|
| Estimated value (ex VAT) | £250k |
| Estimated release date | November 2026 |
| Detail | The Department is seeking marine electrical services to be carried out on the Strangford Lough Ferry Service. |
| Title | Inspection of Underground Maintenance Framework |
|---|---|
| Estimated value (ex VAT) | TBC |
| Estimated release date | November 2026 |
| Detail | The Framework for Inspection and Maintenance of Underground Infrastructure will encompass three Measured Term Contracts to deliver underground inspection and maintenance in the following Contract Areas: IMU1 – Greater Belfast Area IMU2 – Coleraine, Omagh and Fermanagh Areas IMU3 – Armagh & Lisburn Areas Within each Contract Area, the works to be undertaken under this Contract may include, but not be limited to, the following Principal Work Activities which are provided by way of example: A) Desilting of Culverts B) CCTV and Fly-through Surveys of Culverts C) Trenchless / Specialist Repairs of Culverts D) Traffic Management, Gaining Access to Culverts, Associated Civil Works E) Small Scale Civil Works F) Underground Man Entry Repairs |
| Title | Watercourse Maintenance Framework |
|---|---|
| Estimated value (ex VAT) | TBC |
| Estimated release date | November 2026 |
| Detail | The Watercourse Maintenance Framework will establish five Measured Term Contracts covering a range of watercourse maintenance activities throughout Northern Ireland over a four-year in the following contract areas: A. WME1 (Armagh); B. WME2 (Lisburn and Greater Belfast); C. WMW1 (Coleraine); D. WMW2 (Omagh); and E. WMW3 (Fermanagh). The scope of works to be undertaken under each contract may include, but is not limited to, watercourse and channel maintenance; riverbank and flood defence upkeep; vegetation and scrub clearance; tree removal; and the provision of associated labour and plant. Suppliers may also be required to undertake ancillary tasks, such as the treatment of aquatic weeds and invasive species. |
| Title | A1 Junctions Phase 2 - Enabling Works |
|---|---|
| Estimated value (ex VAT) | £1.25m |
| Estimated release date | November 2026 |
| Detail | In advance of the main A1J2 contract, the Enabling Works contract is required to undertake site clearance along the 25km route of the scheme. The works will primarily comprise of tree felling, scrub clearance and other vegetation removal, together with the erection of temporary fencing around lands vested for the scheme. |
| Title | DfI TRAM – Rivers – Supply and Delivery of 3 No. Automated Sandbagging Machines |
|---|---|
| Estimated value (ex VAT) | £54k |
| Estimated release date | November 2026 |
| Detail | Supply and Delivery of 3 No. Automated Sandbagging Machines |
| Title | Ardtrea Bridge Replacement and Carriageway Realignment |
|---|---|
| Estimated value (ex VAT) | £3.2m |
| Estimated release date | December 2026 |
| Detail | Replacement of the existing weight-restricted multi-span reinforced concrete bridge carrying the C563 Lisnahall Road over the Ballinderry River, together with associated carriageway realignment and ancillary works. The works include demolition and removal of the existing structure; construction of a new single-span bridge; carriageway, drainage, parapets and safety restraint systems; utility and accommodation works. |