M1/A1 Sprucefield Bypass - stage 1 scheme assessment report
Date published:
The stage 1 assessment report identies the environmental, engineering, economic and traffic advantages, disadvantages and constraints associated with broadly defined improvement strategies. This concludes in the selection of a number of potential routes or scheme options.
Documents
- M1/A1 Sprucefield Bypass – stage 1 scheme assessment report (March 2011)
- Figures 1.1.1 to 1.1.2 - location plans
- Figures 2.1.1 to 2.1.3
- Figures 2.3.1 to 2.11.1
- Figures 3.1.1 - route corridors
- Figures 4.2.1 to 4.5.6
- Figures 4.8.1 to 4.14.2 - corridor options
- Figures 5.2.1 to 5.8.1
- Figures 5.10.1 to 5.11.5
- Figures 6.1.1 to 6.4.1
- Figure 7.4.1 - preferred corridors