Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Dalradian Curraghinalt Project, LA10/2017/1249/F Further Environmental Information 2020 Volume 3 Part 1 Appendix B9 & B11- B12

    Topics:
    • Planning, 
    • Dalradian Curraghinalt Project

    Date published: 30 January 2025

    Volume 3 Part 1 Appendix B9 & B11- B12

    Documents

    • App B9 - Geochemistry Characterisation Report Part 1Adobe PDF (22.24 MB)
    • App B9 - Geochemistry Characterisation Report Part 2Adobe PDF (7.46 MB)
    • App B9 - Geochemistry Characterisation Report Part 3Adobe PDF (10.5 MB)
    • App B9 - Geochemistry Characterisation Report Part 4Adobe PDF (8.56 MB)
    • App B9 - Geochemistry Characterisation Report Part 5Adobe PDF (23.98 MB)
    • App B9 - Geochemistry Characterisation Report Part 6Adobe PDF (1.41 MB)
    • App B9 - Geochemistry Characterisation Report Part 7Adobe PDF (3.2 MB)
    • App B9 - Geochemistry Characterisation Report Part 8Adobe PDF (10.81 MB)
    • App B11 - Lighting SpecificationsAdobe PDF (5.38 MB)
    • App B12 - Design Drawings - Part 1Adobe PDF (127.65 KB)
    • App B12 - Design Drawings - Part 2Adobe PDF (9.64 MB)
    • App B12 - Design Drawings - Part 3Adobe PDF (2.49 MB)
    • App B12 - Design Drawings - Part 4Adobe PDF (3.16 MB)
    • App B12 - Design Drawings - Part 5Adobe PDF (16.64 MB)
    • App B12 - Design Drawings - Part 6Adobe PDF (2.37 MB)
    • App B12 - Design Drawings - Part 7Adobe PDF (12.13 MB)
    • App B12 - Design Drawings - Part 8Adobe PDF (9.77 MB)
    • App B12 - Design Drawings - Part 9Adobe PDF (12.65 MB)
    • App B12 - Design Drawings - Part 10Adobe PDF (10.11 MB)
    • App B12 - Design Drawings - Part 11Adobe PDF (8.31 MB)
    • App B12 - Design Drawings - Part 12Adobe PDF (7.42 MB)
    • App B12 - Design Drawings - Part 13Adobe PDF (9.77 MB)
    • App B12 - Design Drawings - Part 14Adobe PDF (8.33 MB)
    • App B12 - Design Drawings - Part 15Adobe PDF (12.53 MB)
    • App B12 - Design Drawings - Part 16Adobe PDF (9.9 MB)
    • App B12 - Design Drawings - Part 17Adobe PDF (11.37 MB)
    • App B12 - Design Drawings - Part 18 - Page 1Adobe PDF (2.08 MB)
    • App B12 - Design Drawings - Part 18 - Page 2Adobe PDF (698.83 KB)
    • App B12 - Design Drawings - Part 18 - Page 3 & 4Adobe PDF (4.59 MB)
    • App B12 - Design Drawings - Part 18 - Page 5 to 8Adobe PDF (42.22 KB)
    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens