Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • A55 Knock Road widening - environmental statement appendix 1.1 preferred options report

    Topics:
    • Major Roads Programme, 
    • A55 Knock Road widening scheme

    Date published: 24 April 2007

    This is the preferred options report for A55 Knock Road widening produced in April 2007.

    Documents

    • A55 Knock Road widening environmental statement appendix 1.1 figures 4.1.3a to 4.1.3d air quality options A to DAdobe PDF (2.69 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 existing road conditionsAdobe PDF (8.72 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 outer ring road locationAdobe PDF (5.95 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 map of existing problemsAdobe PDF (1.87 MB)
    • A55 Knock widening environmental statement appendx 1.1 proposed options A to DAdobe PDF (4.49 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.1.1 Belfast City Council AQMAAdobe PDF (2.73 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.1.2 sensitive receptors Adobe PDF (388.53 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.2.1 cultural heritageAdobe PDF (946.18 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 preferred options reportAdobe PDF (6.84 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.4.1 areas of ecological constraintAdobe PDF (680.11 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.4.2 ecological designationsAdobe PDF (1.72 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.5.1 landscapeAdobe PDF (2.25 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.6.1 land useAdobe PDF (1.18 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 preferred options report figure 4.7.1 noise monitoring locationsAdobe PDF (645.94 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.7.2 non residential sensitive receptorsAdobe PDF (1.05 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.10.1 watercourses and existing culvertsAdobe PDF (1.44 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.10.2 groundwater vulnerabilityAdobe PDF (3.09 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.10.3 hydrogeologicalAdobe PDF (105.56 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.11.1 solid geologyAdobe PDF (1.33 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.11.2 drift geologyAdobe PDF (575.92 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.11.3 potential contaminated sitesAdobe PDF (835.2 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 figure 4.12.1 policies and plansAdobe PDF (1.8 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 environmental abbreviationsAdobe PDF (55.92 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 environmental consultee repliesAdobe PDF (6.2 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 archaeological site descriptionsAdobe PDF (47.4 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 accident dataAdobe PDF (1.7 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 - TUBAAdobe PDF (801.09 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 - COBAAdobe PDF (140.09 KB)
    • A55 Knock Road widening environmental statement appendix 1.1 geometric standards reportAdobe PDF (1.34 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 individual access auditAdobe PDF (1.41 MB)
    • A55 Knock Road widening environmental statement appendix 1.1 alternative route timings routes 1 and 2Adobe PDF (2.03 MB)
    • A55 Knock Road widening environmental statement appendix alternative route timing routes 3, 3a and 4 Adobe PDF (2.02 MB)
    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens