Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • A2 Shore Road Greenisland - stage 2 scheme assessment report

    Topics:
    • Major Roads Programme, 
    • A2 Shore Road Greenisland

    Date published: 1 August 2006

    The stage 2 scheme assessment report identifies the factors taken into account in choosing alternative routes or improvement schemes and identifies the environmental, engineering, economic and traffic advantages and constraints associated with those routes or schemes. This concludes in the selection of a preferred route or scheme option.

    Documents

    • A2 Shore Road Greenisland - stage 2 scheme assessment report: executive summary and introductionAdobe PDF (649.08 KB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: figure SAR2/1.1 location of bottleneckAdobe PDF (2.44 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: figure SAR/2 1.2 range of strategiesAdobe PDF (2.31 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: existing conditionsAdobe PDF (6.33 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: description of scheme optionsAdobe PDF (11.73 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: description of scheme options continued, engineering assessment, and environmental assessmentAdobe PDF (7.01 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: environmental assessment continued, traffic and economic assessmentAdobe PDF (12.08 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: traffic and economic assessment continued, review of options for public consultation, public consultationAdobe PDF (3.15 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: public consultation continued, the preferred option - government appraisal criteria, and appendicesAdobe PDF (5.56 MB)
    • A2 Shore Road Greenisland - stage 2 scheme assessment report: appendices continuedAdobe PDF (6.45 MB)
    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens