Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Kilrea Bridge repair scheme to commence on 10 November

    Topics:
    • Roads, 
    • Road users

    Date published: 3 November 2025

    The Department for Infrastructure has confirmed that a scheme to repair the damage to the Kilrea Bridge will commence on Monday 10 November.

    Kilrea Bridge Update - Nov 2025 Graphic

    The bridge has been closed in the interests of public safety since 20 September following an inspection which identified extensive cracking on the retaining wall located at the south-west end of the Bridge.  

    A spokesperson for the Department for Infrastructure said: 

    “Since the closure of the Kilrea Bridge the Department has carried out a ground investigation, developed a technical solution and tendered for a specialist contractor to allow the road to reopen. 

    “We are pleased to confirm that a specialist contractor has now been appointed and work to repair the damage will commence on Monday 10 November. This will be a 14-week scheme, which is longer than originally anticipated, due to the difficult ground conditions on site.  

    “The solution requires specialist equipment to drill between the two approach walls beneath the existing road surface. Tie-bars will then be inserted into these drilled holes to structurally connect the retaining walls on either side of the road.  The contractor has advised that the presence of large boulders will make it more difficult for the drilling operation. As a result, it will take longer to drill, and the installation of each tie-bar will be more time-consuming.

    “The lead-in period before the works start next week will allow time for the contractor to carry out pre-site checks and prepare equipment and ensure all health and safety procedures are in place and agreed with the Department.

    “We are continuing to engage with the contractor to explore options to reduce the timescale.  We will keep the local communities up to date on the timeline throughout the works.

    “We fully appreciate the impact of the ongoing closure and the understandable frustration of the local community, including businesses in the area and we thank them for their patience while we work to deliver a safe and effective solution.  We want to reassure the public that we are working at speed to strengthen the road and will continue to explore every opportunity to accelerate progress and minimise disruption.”

    The Department will continue to provide updates on the repair works on our website at: Kilrea Bridge, B64 Bann Road, Kilrea – Closure

    Notes to editors:

    1. All media queries should be directed to the Department for Infrastructure Press Office at: press.office@infrastructure-ni.gov.uk
    2. The Executive Information Service operates an out of hours service for media enquiries only between 1800hrs and 0800hrs Monday to Friday and at weekends and public holidays. The duty press officer can be contacted on 028 9037 8110.
    3. Follow the Department on social media:
    • X - @deptinfra
    • Facebook- @DepartmentforInfrastructure
    • LinkedIn - @DfILinkedIn
    • Instagram - @departmentforinfrastructure
    • Bluesky - @infrastructure-ni.gov.uk

    Latest news

    • Kilrea Bridge Update – Interim measures to reopen road to light vehicles before Christmas

      7 November 2025

    • Kimmins announces £180,000 road improvement scheme for B4 Lack Main Street

      7 November 2025

    • Kimmins announces plans to tackle inconsiderate pavement parking

      5 November 2025

    • Kimmins congratulates new President of the Institution of Civil Engineers

      5 November 2025

    More news …
    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens