Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Closed consultation York Street interchange - environmental statement notice of determination and publication, Trunk Road Order and notice of intention to make a Vesting Order

    Topics:
    • Major Roads Programme, 
    • Prioritised road schemes

    Consultation closed Consultation opened 25 March 2015, 9.00 am and closed 19 May 2015, 5.00 pm

    Summary

    DfI Roads has developed proposals to provide a grade-separated junction at York Street that would provide direct links between Westlink and the M2 and M3 motorways and greatly improve access between these roads.

    The Westlink, M2 and M3 motorways, which are key sections of the Strategic Road Network, are presently connected through a complex arrangement of traffic signals at York Street. This bottleneck presently causes significant congestion and delays for traffic travelling between Westlink and the M2 and M3 motorways at peak times. The junction will come under increased pressure to deal

    Documents

    • York Street Interchange - draft Designation Order schedule Adobe PDF (49 KB)
    • York Street Interchange - YSI-URS-XX-XX-DR-OR004 - map 1 general arangement Adobe PDF (3 MB)
    • York Street Interchange - YSI-URS-XX-XX-DR-OR005 - map 2 the new roads to be constructed as special and trunk and part of the T1 Adobe PDF (2 MB)
    • York Street Interchange - YSI-URS-XX-XX-DR-OR006 - map 3 the new roads to be constructed as special and trunk and part of the T3 Adobe PDF (3 MB)
    • York Street Interchange - YSI-URS-XX-XX-DR-OR007 - map 4 the new roads to be constructed as special and trunk and part of the T7 Adobe PDF (2 MB)
    • York Street Interchange - YSI-URS-XX-XX-DR-OR008 - map 5 junctions to be Stopped Up and new connecting roads Adobe PDF (2 MB)
    • YSI-TNI-XX-XX-DR-OR100 - York Street Interchange Vesting Order (Northern Ireland) 2015 (drawing 1) Adobe PDF (2 MB)
    • YSI-TNI-XX-XX-DR-OR101 - York Street Interchange Vesting Order (Northern Ireland) 2015 (drawing 2) Adobe PDF (328 KB)

    Help viewing documents

    Consultation description

    The Westlink, M2 and M3 motorways, which are key sections of the Strategic Road Network, are presently connected through a complex arrangement of traffic signals at York Street. This bottleneck presently causes significant congestion and delays for traffic travelling between Westlink and the M2 and M3 motorways at peak times. The junction will come under increased pressure to deal with traffic in the future.

    Environmental statement: notice of determination

    The Department hereby gives notice, in accordance with Article 67A(1) and (9) of the Roads (Northern Ireland) Order 1993 (“the 1993 Order”), that it considers the proposal for the provision of a grade-separated junction at York Street to provide direct links between Westlink and the M2 and M3 motorways a relevant project within the meaning of Article 67(1) of the 1993 Order and falls within Annex I of Council Directive 85/337/EEC on the assessment of the effects of certain public and private projects on the environment, as amended by Directive 97/11/EC and Directive No. 2003/35/EC of the European Parliament and Council (“the Directive”).

    The Department has determined that this proposal should be made subject to an Environmental Impact Assessment in accordance with the Directive.

    Environmental statement: notice of publication

    The Department hereby gives notice in accordance with Article 67A(3) and (9) of the 1993 Order that it has prepared an Environmental Statement on the effects of the proposed provision of a grade-separated junction at York Street

    The aim of the project is to improve conditions for road users by improving safety and reducing and improving the reliability of journey times for vehicular travellers.

    In addition to earthworks and drainage, landscaping will be carried out to improve the appearance of the road and lessen the visual impact of the proposed project.

    Trunk Road Order

    The Trunk Roads T1, T3 AND T7 (York Street Interchange) Order (Northern Ireland) 2015

    The Department hereby gives notice in accordance with the provisions of Schedule 8 to the Roads (Northern Ireland) Order 1993 that it proposes to make an order under Articles 14(1), 15(1) and 68(1), (3) and (5) of that Order.

    The proposed Order will provide that:

    1. 1,177 metres of new and upgraded road described in Part I of the Schedule, become special and trunk road and be part of the Belfast-Bangor Trunk Road T1
    2. 2,373 metres of new and upgraded road described in Part II of the Schedule, become special and trunk road and be part of the Belfast-Ballygawley-Londonderry-Land Frontier Trunk Road T3
    3. 1,718 metres of new and upgraded road described in Part III of the Schedule, become special and trunk road and be part of the Belfast-Coleraine-Londonderry Trunk Road T7
    4. the Order also provides for the stopping-up of certain roads

    Notice of intention to make a Vesting Order

    The Department proposes to make an order vesting certain lands in the Department under the Local Government Act (Northern Ireland) 1972 and The Roads (Northern Ireland) Order 1993.

    The Department proposes to acquire the lands for the construction of a grade-separated junction at York Street that would provide links between Westlink and the M2 and M3 motorways.

    Inspect to Order

    All documents and maps relating to the scheme may be inspected and further information relating to the proposals may be obtained by any person, free of charge, at all reasonable hours at the TransportNI offices:

    DfI Roads Headquarters
    Clarence Court
    10-18 Adelaide Street
    Belfast
    BT2 8GB
    Eastern Division
    Hydebank
    4 Hospital Road
    Belfast
    BT8 8JL.

    Alternatively, an electronic version of the environmental statement (non-technical summary) is available below:

    • York Street Interchange - environmental statement (non-technical summary)

    Your Opinion

    Any person who wishes to express an opinion on the Environmental Statement or to object to the making of The Trunk Road T1, T3 and T7 (York Street Interchange) Order (Northern Ireland) 2015, or the proposed Vesting Order must, on or before, write to:

    The Divisional Manager
    DfI Roads – Eastern Division
    Hydebank
    4 Hospital Road
    Belfast
    BT8 8JL

    stating their opinion on the environmental statement and/or the grounds of their objection to the proposed Orders. The Department will take into consideration any representations made before deciding whether or not to proceed with the project with or without modifications.

    Information you provide in your response, including personal information, could be published or disclosed under the Freedom of Information Act 2000 (FOIA) or the Environmental Information Regulations 2004 (EIR). For further details on confidentiality and FOIA/EIR please refer to https://ico.org.uk/.

    Ways to respond

    Consultation closed — responses are no longer being accepted.

    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens