Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Closed consultation Traffic Calming Scheme - Bracken Ridge / Bracken Avenue, Newmills

    Topics:
    • Roads

    Consultation closed Consultation opened 15 February 2023, 9.00 am and closed 20 March 2023, 5.00 pm

    Summary

    Notice is hereby given that under Article 65 of the Roads (NI) Order 1993, the Department proposes to introduce road humps and other traffic calming works at Windsor Terrace to control the speed of traffic.

    Documents

    • Traffic Calming Scheme - Bracken Ridge / Bracken Avenue, Newmills - map Adobe PDF (577 KB)

    Help viewing documents

    Consultation description

    The road humps will be constructed in accordance with the Road Humps Regulations (NI) 1999, other features will be constructed in accordance with the Traffic Calming Regulations (Northern Ireland) 1995, and consist of:

    • Provision of 20 mph zone in the above area, including appropriate signing at the estate entry points.
    • 1 number flat top road humps with tapered ends, approximately 4.1m long, kerb to kerb width and 75-80mm high, at the following locations:
      • Adjacent to no 27/28 Bracken Ridge
      • Adjacent to no 1/3 Bracken Ridge Avenue

    Inspecting the proposals

    A map showing the road humps and other traffic calming works may be inspected free of charge, during office hours at the Omagh Office mentioned below, or at:

    Moygashel Maintenance Section Office
    Main Street
    Moygashel
    Dungannon

    Making an objection

    Objections or other representations may be made, before 20 March 2023, in writing to:

    Department for Infrastructure, Roads
    County Hall
    Drumragh Avenue
    Omagh
    BT79 7AF

    Ways to respond

    Consultation closed — responses are no longer being accepted.

    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens