Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Closed consultation Proposed Maintenance works to The Cutts Control Structure, Castleroe Road, Coleraine

    Topics:
    • Waterways, 
    • Rivers and lough levels

    Consultation closed Consultation opened 26 October 2022, 9.00 am and closed 23 November 2022, 5.00 pm

    Summary

    The Department for Infrastructure hereby gives notice, in pursuance of Article 12A of the Drainage (Northern Ireland) Order 1973 (as amended) that it proposes to carry out maintenance works to The Cutts Control Structure, Coleraine including mechanical and electrical works, concrete repairs and painting of steel work.

    Documents

    • The Cutts Control Structure, Castleroe Road, Coleraine - Map Adobe PDF (586 KB)

    Help viewing documents

    Consultation description

    The purpose of the scheme is to maintain the structure to allow it to
    continue to meet DfI Rivers’ obligations under the Lough Neagh and
    Lower Bann Drainage and Navigation Act (NI) 1955. The proposed works
    will include the repainting of all relevant elements of the control structure,
    concrete repairs and upgrading/repairing the mechanical and electrical
    elements of the structure to current standards.

    Having taken account of the characteristics of the works in the proposed
    scheme, their location and potential impacts, the Department considers
    the proposed scheme is not likely to have significant environmental
    effects and does not intend to prepare an Environmental Statement.

    Inspecting the proposals

    A copy of the proposed scheme will be available for inspection at the
    addresses below, from 26th October 2022 to 23rd November 2022, during
    normal opening hours at:

    • DfI Rivers Office, 37 Castleroe Road, Coleraine, BT1 35RL and
    • Causeway Coast and Glens Borough Council, 66 Portstewart Road, Coleraine, BT52 1EY

    Making an objection

    In accordance with Article 12A, representations may be made in writing to
    the Department in relation to the likely environmental effects of the
    proposed scheme. Also, in accordance with Article 12A, any person who
    considers that their interests will be prejudicially affected by the proposed
    scheme may make representations to the Department at the address
    given below.

    The closing date for receipt of representations is 23rd November 2022

    Any representations should be sent to: -
    Mr Tommy O’Neill, DfI Rivers, 49 Tullywiggan Road, Loughry,
    Cookstown, BT80 8SG.

    Ways to respond

    Consultation closed — responses are no longer being accepted.

    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens