Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • 1st Cycle - Managing the risk of Flooding

    Topics:
    • Rivers and flooding, 
    • European Floods Directive - 1st Cycle

    Flooding is a natural phenomenon and has a devastating impact on communities. It cannot be entirely prevented but by working together we can plan to effectively manage the risk.

    What are the effects of flooding?

    The effects of flooding are wide ranging, impacting on the economy, social wellbeing and the environment.

    For individuals and communities the impact can be significant in terms of personal suffering and financial loss and, even where flooding has natural causes, it can have damaging effects on the environment.

    Essential services such as mains water, electricity and transport can be disrupted. Property and possessions can be damaged and most seriously, flooding can result in injury and death.

    Under the Floods Directive we manage these risks by:

    • prevention: avoiding construction of houses and industries in flood-prone areas; by adapting future developments to the risk of flooding; and by promoting appropriate land-use, agricultural and forestry practices
    • protection: taking measures, both structural and non-structural, to reduce the likelihood and impact of floods
    • preparedness: informing the public about flood risk and what to do in the event of a flood

    To achieve its objectives, the Directive will address flood risk in Northern Ireland on a catchment-wide scale. This is because flooding problems may be affected by the characteristics of the catchment.

    A catchment is an area drained, either naturally or with artificial assistance, by a watercourse, including all drainage channels, tributaries, floodplains, estuaries and areas of water storage.

    The Floods Directive requires consideration of flooding by sea, rivers and lakes, surface water and reservoirs. By assessing the ‘bigger picture’ we can ensure that the flood risk is fully understood which will help us make sustainable, long term decisions.

    Flood risk management through the Floods Directive takes place alongside government’s ongoing programme of drainage and flood alleviation measures.

    The Northern Ireland legislation to enable the Directive was introduced in 2009 and is called The Water Environment (Floods Directive) Regulations (Northern Ireland) 2009. The legislation requires the completion of the preliminary flood risk assessment by December 2011, flood risk and flood hazard maps for significant risk areas by December 2013 and flood risk management plans by 2015. The plans will set out our objectives, measures and an action plan for managing flood risk.

    Significant flood risk areas

    The map and table below show the areas which we have identified as the Significant Flood Risk Areas (SFRA) and additionial Areas for Further Investigation (AFI). This is a critical milestone in the implementation of the EU Directive as it identifies the areas for which we are required to produce flood risk management plans.

    Flood risk is a measure of the statistical probability that flooding will occur combined with the adverse consequences of the flooding. The assessment of future flood risk therefore requires a detailed understanding of the flood mechanisms for each source of flooding, the magnitude and statistical probability of flood events and the scale of the potential adverse consequences arising from these events.

    The extent of the potential future flood hazards for each source of flooding for a range of return periods was determined using predictive flood inundation models developed by DfI Rivers for rivers, sea and surface water. Although strategic in nature these models have been developed using best practice methodologies that utilise the available topographical and land use data.

    • Map of significant flood risk areas

    For each area we have provided details of the flood source and the impact it could potentially have on the people, places, infrastructure and activities in that area.

    Areas of study in the Neagh Bann FRMP District

    Significant flood risk areasAreas for further investigationAreas continued
    NewryMagherafeltGracehill
    PortadownDungannonRostrevor
    WarrenpointRandalstownCookstown
    BanbridgeWaringstownArmagh
    LurganLimavadyStoneyford
    Glengormley & MalluskCoalislandBallygawley (St Ciaran's)
    AntrimGlenavyMoneymore
    BallymenaKeadyAhoghill
    ColeraineBallyclareBallymoney
    CastledawsonMaghera

    Areas of study in the North East FRMP District

    Significant flood risk areasAreas for further investigationAreas continued
    BelfastLarneBallynahinch
    NewtownardsComberLisburn
    Carrickfergus & Kilroot Power StationBallygowanSaintfield
    BangorHolywoodBallygally
    NewcastleDromoreDrumaness
    NewtownabbeyBushmillsCarryduff
    DownpatrickWhitehouseCushendall
    DundonaldBallycastlePortush

    Areas of study in the North West FRMP District

    Significant flood risk areasAreas for further investigationAreas continued
    LondonderryEglintonSion Mills
    OmaghCastledergBallymagory
    StrabaneEnniskillenFintona
    BallinamallardNew Buildings
    LisbellawMaguiresbridge
    Coolkeeragh (power station)Beragh
    Newtownstewart

    This report contains a narrative which describes the adverse consequences of major floods which occurred in the past but also focuses on the quantification and measurement of the potential adverse consequences of floods that may occur in the future.

    • Preliminary Flood Risk Assessment (PFRA)

    Flood maps (NI)

    Flood Maps (NI) shows the areas in Northern Ireland that have flooded from rivers and the sea in the past and those which may be prone to flooding now and in the future. It also shows where existing flood defences are located and highlights the areas that benefit from these.

    Please note, the map illustrates a national assessment of flood prone areas but it is not sufficiently accurate to determine the flood risk to individual properties or specific point locations. Please also note that it currently does not illustrate flooding from sources such as reservoirs.

    • Flood Maps (NI)

    Belfast tidal flood animation

    Using the latest modelling technology DfI Rivers has produced a 5 minute animation to better illustrate the impact of a tidal flood event on Belfast.

    The animation builds on the information available from 2008 in the Strategic Flood Map by indicating flow paths, the speed with which flooding will happen and water depths.

    Most importantly, it shows how a tidal flood is likely to develop over the tidal cycle.

    The likelihood of a coastal flood is considered to be low, however, it is clear that the consequences or impacts of such an event would be very high.

    The animation is based on a one in 200 year event.

    To watch the animation, please click on the link below. Please note, you will require a video player that supports mp4 files in order to watch this. If you are experiencing difficulties with this animation, please contact us and we will provide an alternative format for you.

    • Belfast tidal flood animation

    Related content

    • 1st Cycle - Flood Hazard and Flood Risk Maps
    • 1st Cycle - Flood Risk Management Plans 2015-2021
    • 1st Cycle - Preliminary Flood Risk Assessment
    • 1st Cycle - Supporting information and Guidance relating to the European Floods Directive
    • 1st Cycle - Timeline and Preparatory Stages
    • 1st Cycle - Who is involved in managing the risk of flooding?
    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens