DFI/2022-0023 - EIR Request for details of the Lagan Gateway Bridge project in South Belfast, including: 1) the total cost; 2) the cost above DfI estimate; 3) the amount of natural vegetation removed; 4) how often the canal system was used since, etc.
Date published:
DFI/2022-0023: Environmental Information Regulations 204 request for details of the Lagan Gateway Bridge project in South Belfast.
An Environmental Information Regulations 204 request for details of the Lagan Gateway Bridge project in South Belfast, including: 1) the total cost; 2) how far the cost was above DfI estimate; 3) the amount of natural vegetation removed; 4) the number of times the canal system has been used since completion; 5) a copy of any EIA determination; 6) copies of all correspondence about works at the bottom of Hampton Park, Galwally; 7) details of any Executive Ministers consulted; 8) whether the scheme was considered to be cross-cutting; 9) copies of all correspondence with Lagan Valley Regional Park; 10) whether a Marine Licence was thought necessary to construct the canal system; 11) any consultation with DAERA about a licence; or 12) licenced activities; & 13) any legal opinion provided to the Department about the need for a licence.