Traffic Calming Scheme - Moss Road, Londonderry

Topics:
Consultation opened on 02 May 2018. Closing date 04 June 2018.

Summary

Notice is hereby given that under Article 65 of The Roads (Northern Ireland) Order 1993 the Department proposes to construct road humps and other traffic calming works on Moss Road, Londonderry to control the speed of traffic.

Documents

Consultation description

The road humps will be constructed in accordance with The Road Humps Regulations (Northern Ireland) 1999 and The Traffic Calming Regulations (Northern Ireland) 1995 and will consist of:

  • Four pair of staggered cushion type humps, each hump approximately 3.1 metres long, 1.9 metres wide and 75mm high and 2no flat top humps approximately 4.5 metres long and 75mm high.

Inspecting the proposal

A map showing the road humps and other traffic calming works may be inspected free of charge during office hours at the office below.

Making an objection

Objections to the proposals may be made to the Department for Infrastructure at the following address or by email to trafficwestern@infrastructure-ni.gov.uk before 4 June 2018.

DfI Roads Western Division
1 Crescent Road
Derry
BT47 2NQ  

Any information you give, including personal information, could be published or disclosed under the Freedom of Information Act 2000 (FOIA) or the Environmental Information Regulations (EIR). For further details on confidentiality, the FOIA and EIR please refer to https://www.ico.org.uk

Share this consultation

Back to top