Skip to main content
Department for Infrastructure Department for Infrastructure An Roinn Bonneagair Depairtment fur Infrastructure

Main navigation

  • Home
  • Topics
  • Publications
  • Consultations
  • Contact

Translation help

Translate this page

Select a language

  • Arabic — عربي
  • Chinese (Simplified) — 中文简体
  • Chinese (Traditional) — 中文繁體
  • Dutch — Nederlands
  • Filipino — Filipino
  • French — Français
  • German — Deutsch
  • Hungarian — Magyar
  • Irish — Gaeilge
  • Italian — Italiano
  • Latvian — Latviešu
  • Lithuanian — Lietuvių kalba
  • Polish — Polski
  • Portuguese — Português
  • Romanian — Română
  • Russian — Русский
  • Slovak — Slovenčina
  • Spanish — Español
  • Ukrainian — Українська
  • Closed consultation Traffic Calming Scheme - Kingarve Road, Dungannon

    Topics:
    • Major Roads Programme, 
    • Roads, 
    • Roads legislation

    Consultation closed Consultation opened 4 December 2024, 9.00 am and closed 6 January 2025, 5.00 pm

    Summary

    Notice is hereby given that under Article 65 of the Roads (NI) Order 1993, the Department proposes to introduce road humps and other traffic calming works at Kingarve Road to control the speed of traffic.

    Documents

    • Traffic Calming Scheme - Kingarve Road, Dungannon - Map Adobe PDF (80 KB)

    Help viewing documents

    Consultation description

    The road humps will be constructed in accordance with the Road Humps Regulations (NI) 1999, other features will be constructed in accordance with the Traffic Calming Regulations (Northern Ireland) 1995, and consist of:

    1 number flat top road hump with tapered ends, approximately 4.1 metres long, kerb to kerb width and 75-80 mm high, at the following locations:

      • Adjacent to no 6/8 Kingarve Road, Dungannon
      • Adjacent to no 16 Kingarve Road, Dungannon

    Inspecting the proposal

    A map showing the road humps may be inspected free of charge, during office hours at the address below, or at Moygashel Section Office, 1 Main Road, Moygashel, Dungannon BT71 7QR, by appointment only. Telephone 028 8225 4085 to arrange.

    Making an objection

    Objections or other representations may be made in writing to the Department for Infrastructure, Roads, Network Development, County Hall, Drumragh Avenue, Omagh, BT79 7AF, within a period of 31 days from the publication of this notice.

    Ways to respond

    Consultation closed — responses are no longer being accepted.

    Share this page Share on Facebook (external link opens in a new window / tab) Share on X (external link opens in a new window / tab) Share by email (external link opens in a new window / tab)

    Department footer links

    • Crown copyright
    • Terms and Conditions
    • Privacy
    • Cookies
    • Accessibility
    • The Northern Ireland Executive
    • The Executive Office
    • Department of Agriculture, Environment and Rural Affairs
    • Department for Communities
    • Department for Education
    • Department for the Economy
    • Department of Finance
    • Department for Infrastructure
    • Department for Health
    • Department of Justice
    • nidirect.gov.uk — the official government website for Northern Ireland citizens