This begins with an examination of broadly defined routes, progressing through the selection of a ‘preferred route’ to detailed environmental assessment and design.
A Stage 3 assessment involved further design development of the preferred route. This stage of assessment requires preparation of an Environmental Statement, production of a Draft Direction Order and Draft Vesting Order.